Showing posts with label 2011 Dahon Vector X10. Show all posts
Showing posts with label 2011 Dahon Vector X10. Show all posts

Saturday, October 29, 2011

Penang Foldie Night Ride Part 1

The four-hour drive to Penang
I've obtained clearance to head up to Penang to do a piece on the Foldie Night Ride organised by G-Club, a group of cycling enthusiasts.
These are the same people who were responsible for the Campaign For A Lane 3 ride which I attended with my wife on September 11 recently.
I left KL for Penang with my Dahon Jetstream EX at 11:30am via the PLUS North-South Highway.
Only made one stop at Gunung Semanggol R&R area and continued my journey towards the Penang Bridge.
By 3:45pm, I was already on the Jelutong Expressway, heading towards the city area.
My mission was to locate the Tune Hotel in Burma Road.
This took a while as I trying to find my way around. I thought the nearest point of reference was McAllister Road.

Checking-in 
After much struggling, I found the place that I was going to crash for the night.
Initially, I parked the Samo-mobile on the roadside next to a public housing scheme.
Later, when I checked-in a the hotel, I was told that a flat-rate of RM5 is charged for those who want to park in the hotel's compound.
There's just enough space to put 12 cars in the area.
Lucky for me, I managed to score a parking lot, making things easier.
The plan was to change in my 'away' RaceReady jersey and Zoic padded shorts.
For this ride, I brought my Pango folding helmet fitted with a Sigma Micro-R helmet light.


Booster fuel: Mee Rebus!
The ride plan
So, here's how it would go: I ride from Tune Hotel to Straits Quay.
This is roughly about 8km from where I was staying. 
But before that, my intention was to fill up my tummy.
I found a coffee shop serving Mee Rebus.
A friendly lady there prepared the meal at RM4.50 a pop.
After a hearty fill, I made my way to the carpark, set up my Jetstream.
It was drizzling and started to rain.
I set my Garmin EDGE800 on navigation mode as I am not sure of the way to Straits Quay where the ride is supposed to be flagged off.


Wet, wet, wet..
From Burma Road, I cycled towards Mount Erskine. 
This is a light climb and well, a warm-up round and the light drizzle made it a breeze.
After the sloped ride, its a sharp right-turn on Fettes Road before getting back on Tanjung Pinang.
Its started to rain heavily when I arrived at Straits Quay by 5:30pm and rode my way towards the event hall.
Nobody was there stop me as I slowly rolled towards the registration booth.
A lady, who was very helpful screened my name on the registration list.
My bike was tagged with number '0006' and after I was done with the formalities, I made my way to Coffee Bean and ordered a cup of coffee.
At Straits Quay, I met Mr Money, distributor of Strida Folding Bicycles at the event location.
He was going all-out to sell the Stridas.
I looked at another dealer whom I met before at PIPR series 11 in Putrajaya.
The dude was cycling a recumbent bike and was featured in an article published by The Star on personalities with folding bikes.
The man in question was 'Scuba Sim'..


Mr Scuba riding my bike..

Thursday, August 11, 2011

2011 Dahon Vector X10: First impressions

Last of the Vectors: the X10 is value for money
The new latch design on the bike's hinge
High performance: Schwalbe Durano tires are fitted on most high-end road bikes
The first batch of Dahon's 2011 Vector X-10 arrived here in Malaysia sometime in late-January.
Prior to that, there were a lot of hoo-haas about the bike.
Some folding bike guru even talked about getting it. But when the day came, it was all talk.
Other seasoned foldies scoff at how the VRO handlebar folds.
They don't like it at all.
When you produce a high-performance folding bike, some details are sacrificed.
The Vector won't be a Eurobike 2010 award winner if its a piece of crap.
And when you expect things like that to be cheap, well, I guess you are looking at the wrong places.
My contact in Dahon told me that a batch of 10 Vector X10s are their last order from Taiwan.
They arrived in early July and are now in the stores.
It took a while for the crowd here to warm up to the Vectors and once people are aware of its performance, they were gone.
And 2011 is the best year to get hold of any Dahon bikes.
This is still under the purvue of the old international team and the factory guys who gave folding bike owners around the world their mark of quality.
I must say that I didn't really pay much attention to the X10 when it first came to Malaysia.
Seeing it gather dust at the showroom was painful.
But gradually, the bike found its way to two owners.
They were the first of the Vector owners and I hope they enjoy riding it.
The Vector X10 is a fast bike worthy enough to be called an instant classic.
It replaced the Dahon Mu EX and has a real solid and rigid frame. Thanks to the hydroforming frame technology.
Since the X10 is factory bike with extreme components, you can expect the best.
And with a price tag below RM6k, its worth considering if you are moving up a couple of notches.
Very few folding road bikes can match up with the quality thrown in.
Well, seriously, those who know what they are looking for would go for the Vector X10.